Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 9 results ...

Carrillo, P (2004) Managing knowledge: lessons from the oil and gas sector. Construction Management and Economics, 22(06), 631-42.

Chew, M Y L, Silva, N D and Tan, S S (2004) A neural network approach to assessing building façade maintainability in the tropics. Construction Management and Economics, 22(06), 581-94.

  • Type: Journal Article
  • Keywords: Maintainability; façade; risk; building defect; neural network; sensitivity analysis
  • ISBN/ISSN: 0144-6193
  • URL: https://doi.org/10.1080/01446190310001631019
  • Abstract:

    A model was developed to assess the maintainability of façade using neural network techniques. Inputs were derived from comprehensive studies of 570 tall buildings (more than 12 stories) through detailed field evaluation and interviews with professionals in the whole building delivery process. Sensitivity analysis showed that the most significant factors associated with façade maintainability include the system selection, detailing, accessibility and material performance.

Ho, M-F, Drew, D, McGeorge, D and Loosemore, M (2004) Implementing corporate ethics management and its comparison with the safety management system: a case study in Hong Kong. Construction Management and Economics, 22(06), 595-606.

Johnstone, I M (2004) Development of a model to estimate the benefit-cost ratio performance of housing. Construction Management and Economics, 22(06), 607-17.

Lowe, D J and Parvar, J (2004) A logistic regression approach to modelling the contractor's decision to bid. Construction Management and Economics, 22(06), 643-53.

Rooke, J, Seymour, D and Fellows, R (2004) Planning for claims: an ethnography of industry culture. Construction Management and Economics, 22(06), 655-62.

Trigunarsyah, B (2004) A review of current practice in constructability improvement: case studies on construction projects in Indonesia. Construction Management and Economics, 22(06), 567–80-.

Wong, E O W and Yip, R C P (2004) Promoting sustainable construction waste management in Hong Kong. Construction Management and Economics, 22(06), 563-6.

Yang, I-T and Ioannou, P G (2004) Scheduling system with focus on practical concerns in repetitive projects. Construction Management and Economics, 22(06), 619-30.